Performance of trenching trials on the 3 sites of Fécamp, Courseulles and Saint-Nazaire as part of the preparation of the call for tenders for the construction works of the French offshore windfarms.

Location : Fécamp, Courseulles, Saint Nazaire – France
Client : EMF

Length (km): 
Water depth (m) : 30
Vessel : DP Vessel
Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
Burial depth (m) : 1
Product : NA
Weight (kg/m) : NA
Diameter : NA

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos