Home » Projets » 2014 EMF Trials in situ

2014 EMF Trials in situ

Performance of trenching trials on the 3 sites of Fécamp, Courseulles and Saint-Nazaire as part of the preparation of the call for tenders for the construction works of the French offshore windfarms.

Location : Fécamp, Courseulles, Saint Nazaire – France
Client : EMF

Length (km): 4 
Water depth (m) : 30
Vessel : DP Vessel
Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
Burial depth (m) : 1
Product : NA
Weight (kg/m) : NA
Diameter : NA

Other projects

  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
    Burial system :
    Plus d’infos
  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos