Home » Projets » 2014 SAFANIYA 2

2014 SAFANIYA 2

Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.

Location : SAFANIYA 2 oild field – Saudi Arabia
Client : Mc Dermott / Saudi Aramco

Product : Power Composite Cable
Length (km): 7.4
Water depth (m) : 0 to 7.5
Vessel : Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1
Weight (kg/m) : 52
Diameter : 214 mm

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos
  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos