Home » Projets » 2014 SAFANIYA 2

2014 SAFANIYA 2

Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.

Location : SAFANIYA 2 oild field – Saudi Arabia
Client : Mc Dermott / Saudi Aramco

Product : Power Composite Cable
Length (km): 7.4
Water depth (m) : 0 to 7.5
Vessel : Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1
Weight (kg/m) : 52
Diameter : 214 mm

Other projects

  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos