Home » Projets » 2015 BALTIC 2

2015 BALTIC 2

Provision of personnel and equipment to carry out the post burial of 75 infield power cables.

Location : BALTIC 2 Offshore Windfarm / German Baltic Sea
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 61
Water depth (m) : up to 45 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 2
Weight (kg/m) : –
Diameter : 

Other projects

  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos