2015 FITZROY Port Hedland

2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching (both cables in the same trench) and surface lay with a minimum 5m separation between both cables. Installation of articulated pipes.

Location : Port Hedland / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 2 x 44
Water depth (m) : up to 17 m
Vessel : Barge
Burial system : TM04 (trenching) + EBJ (jetting)
Burial depth (m) : 0.5
Weight (kg/m) : 3.5
Diameter : 35

Other projects

  • 2017 QUINTILLION ALASKA

    1 separate shore end. 16 km cable installation with laying and burial.
    Burial system : ESV12 (vibrating plough)
    Plus d’infos
  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2004 SIMIAN SAPHIRE

    Provision of nearshore trenching services.
    Burial system : TJV06 (Jetting)
    Plus d’infos