Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable in shallow water.

Location : WASIT field – Saudi Arabia
Client : Subtech Qatar Diving and Marine Services/ Saudi Aramco

Product : Power Composite Cable
Length (km): 9.2
Water depth (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trenching)
Burial depth (m) : 0.6 to 1.1
Weight (kg/m) : 16
Diameter : 106 mm

Other projects

  • 2022 2 AFRICA & BLUE

    Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea
    Burial system :
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos
  • 2003 AL KHAFJI

    Laying and burial of 40 km of power cable in Saudi Arabia.
    Burial system : TM02 (Trencher)