Home » Projets » 2015 WASIT

2015 WASIT

Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable in shallow water.

Location : WASIT field – Saudi Arabia
Client : Subtech Qatar Diving and Marine Services/ Saudi Aramco

Product : Power Composite Cable
Length (km): 9.2
Water depth (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trenching)
Burial depth (m) : 0.6 to 1.1
Weight (kg/m) : 16
Diameter : 106 mm

Other projects

  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos