2016 MARJAN GOSP

Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.

Location : Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 31 km
Water depth (m) : 0 to 30
Vessel : Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1
Weight (kg/m) : 83
Diameter : 214 mm

Other projects

  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2017 LTAII

    Provision of personnel and equipment to carry out trebsching services on a total of 10 submarine power cables.
    Burial system : TM03 + TM04 (trenchers)
    Plus d’infos
  • 2023 SeaGreen

    Assistance to laying, PLIB
    Burial system :