2024 REVOLUTION WIND

Assistance to laying, PLIB

Location: USA
Customer: SEAWAY 7

Length (km): only transition pieces
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø