Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.

Location : Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 31 km
Water depth (m) : 0 to 30
Vessel : Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1
Weight (kg/m) : 83
Diameter : 214 mm

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2001 ANTARES

    Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).
    Burial system : N.A.
    Plus d’infos
  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher