Home » Projets » 2016 VEJA MATE

2016 VEJA MATE

Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.

Location : Veja Mate Windfarm / North sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 87
Water depth (m) : up to 40 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos