2017 LTAII

Provision of personnel and equipment to carry out trenching services on four 115 kV submarine power cables on Berri field + one 115 kV and five 15 kV submarine power cables on Safaniya field.

Location : Berri and Safaniya fields – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 16 + 15 km
Water depth (m) : 0 to 6
Vessel : Barge
Burial system : TM03 + TM04 (trenchers)
Burial depth (m) : 1
Weight (kg/m) : up to 83
Diameter (mm) : up to 218

Other projects

  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos