Home » Projets » 2020 Dunant

2020 Dunant

Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.

Location : Saint Hilaire de Riez / France
Client : Subcom

Product : Fibre optic cable 
Length (km): 5
Water depth (m) : up to 15 m
Vessel : DP Vessel
Burial system : TO Mobile NV (jetting)
Burial depth (m) :

Other projects

  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos