2020 Dunant

Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.

Location : Saint Hilaire de Riez / France
Client : Subcom

Product : Fibre optic cable 
Length (km): 5
Water depth (m) : up to 15 m
Vessel : DP Vessel
Burial system : TO Mobile NV (jetting)
Burial depth (m) :

Other projects

  • 2011 ACE – SENEGAL

    2 direct FO shore-ends in Dakar (Senegal). Protection of cable (burial, articulated pipes, grout bags)
    Burial system : EBJ (Jetting)
    Plus d’infos
  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos