2023 BLUE BASTIA

1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies

Location: Bastia, France Plage de l’Arinella
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 750 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm