2011 WALNEY 2

Post Lay Inspection and Burial of 51 infield power cables.

Location : Walney Offshore Windfarm – Irish Sea
Client : VSMC-DONG

Length (km): 50
Water depth (m) : 20
Vessel : DP vessel
Burial system : ROVJET605 (jetting)
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 22
Diameter : max 133 mm