Home » Projets » 2011 WALNEY 2

2011 WALNEY 2

Post Lay Inspection and Burial of 51 infield power cables.

Location : Walney Offshore Windfarm – Irish Sea
Client : VSMC-DONG

Length (km): 50
Water depth (m) : 20
Vessel : DP vessel
Burial system : ROVJET605 (jetting)
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 22
Diameter : max 133 mm

Other projects

  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2022 MAPUTO

    Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
    Burial system :
    Plus d’infos
  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos