Home » Projets » 2023 MARTINIQUE

2023 MARTINIQUE

Installation of 2 new electrical links in the bay of Fort de France

Location: France mARTINIQUE / Fort de France
Customer: EDF

Length (km): 2 x 6 km
Water depth (m) :
Vessel: BARGE DP
Beaching system: TO MOBILE / NV
Beaching depth (m): N/A
Product : Power Cable
cable type: ø108mm

Other projects

  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos