Home » Projets » 2023 MARTINIQUE

2023 MARTINIQUE

Installation of 2 new electrical links in the bay of Fort de France

Location: France mARTINIQUE / Fort de France
Customer: EDF

Length (km): 2 x 6 km
Water depth (m) :
Vessel: BARGE DP
Beaching system: TO MOBILE / NV
Beaching depth (m): N/A
Product : Power Cable
cable type: ø108mm

Other projects

  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 1999 CIRCE

    Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
    Burial system : MED1 (Dredge pump) – CASTOR (Trencher)
    Plus d’infos