2023 MARTINIQUE

Installation of 2 new electrical links in the bay of Fort de France

Location: France mARTINIQUE / Fort de France
Customer: EDF

Length (km): 2 x 6 km
Water depth (m) :
Vessel: BARGE DP
Beaching system: TO MOBILE / NV
Beaching depth (m): N/A
Product : Power Cable
cable type: ø108mm

Other projects

  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2016 AL NASR QAFFAY

    Cable laying and burial between mainland and Qaffay Island.
    Burial system : TM04 (trenching)
    Plus d’infos