Home » Projets » 2023 MARTINIQUE

2023 MARTINIQUE

Installation of 2 new electrical links in the bay of Fort de France

Location: France mARTINIQUE / Fort de France
Customer: EDF

Length (km): 2 x 6 km
Water depth (m) :
Vessel: BARGE DP
Beaching system: TO MOBILE / NV
Beaching depth (m): N/A
Product : Power Cable
cable type: ø108mm

Other projects

  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2026 Lumalink

    Mobilization of the DP barge in Panama, followed by towed transit to Cayenne (French Guiana). Separate shore-end landing, simultaneous laying and burial of 15 km of fiber optic cable.
    Burial system :
    Plus d’infos