2024 MAJAN 1

1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system

Location: Salalah Oman
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.5 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm