2025 CSN-1 PANAMA
Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber-optic cable
Location: Costa del Este, Panama
Customer: ALCATEL SUBMARINE NETWORKS
Length (km): 11.8 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm




