2025 HE DREIHT

Assistance to laying, PLIB

Location: USA
Customer: SEAWAY 7

Length (km): 98 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2024 MARSEILLE

    1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system
    Burial system :