Home » Projets » 2025 HE DREIHT

2025 HE DREIHT

Assistance to laying, PLIB

Location: USA
Customer: SEAWAY 7

Length (km): 98 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2022 2/AFRICA GENES

    2 x Direct landings in Genoa. Installation of shells and post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2008 TAURT FIELD DEVELOPMENT

    Post trenching of subsea umbilical / PLIB
    Burial system : ROVJET401 (Jetting)
    Plus d’infos