Home » Projets » 2025 MARJAN GOSP 4

2025 MARJAN GOSP 4

Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.

Location: Kingdom of Saudi Arabia
Customer: McDERMOTT

Length (km): 2 x 31 km
Water depth (m): 7.5 m
Vessel: DP barge
Trenching system: TMO 3 Trencher
Trenching depth (m): 1
Product : Power cable
cable type: 230kV, 3C x 1000mm²+ 72 FO
OD 239mm

Other projects

  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos
  • 2016 NORDSEE ONE

    Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos