Home » Projets » 2025 MARJAN GOSP 4

2025 MARJAN GOSP 4

Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.

Location: Kingdom of Saudi Arabia
Customer: McDERMOTT

Length (km): 2 x 31 km
Water depth (m): 7.5 m
Vessel: DP barge
Trenching system: TMO 3 Trencher
Trenching depth (m): 1
Product : Power cable
cable type: 230kV, 3C x 1000mm²+ 72 FO
OD 239mm

Other projects

  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos
  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos