2014 EMF Trials in situ

Performance of trenching trials on the 3 sites of Fécamp, Courseulles and Saint-Nazaire as part of the preparation of the call for tenders for the construction works of the French offshore windfarms.

Location : Fécamp, Courseulles, Saint Nazaire – France
Client : EMF

Length (km): 
Water depth (m) : 30
Vessel : DP Vessel
Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
Burial depth (m) : 1
Product : NA
Weight (kg/m) : NA
Diameter : NA