2018 MERKUR OWF
Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
Location : Merkur Offshore Windfarm / Germany
Client : Seaway Offshore Cables
Product : Power Cable
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5