Home » Projets » 2016 VEJA MATE

2016 VEJA MATE

Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.

Location : Veja Mate Windfarm / North sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 87
Water depth (m) : up to 40 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 1999 DCN TOULON

    Power and composite cables inside miltary harbour.
    Burial system : N.A.
    Plus d’infos
  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos