Home » Projets » 2011 WALNEY 1

2011 WALNEY 1

Post Lay Inspection and Burial of infield power cables

Location : Walney Offshore Windfarm – Irish Sea
Client : VSMC-DONG

Length (km): 40
Water depth (m) : 20
Vessel : DP vessel
Burial system : ROVJET605 (jetting)
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 19
Diameter : max 139 mm

Other projects

  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2021 Saint Nazaire OWF

    EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection
    Burial system :
    Plus d’infos