Home » Projets » 2011 WALNEY 1

2011 WALNEY 1

Post Lay Inspection and Burial of infield power cables

Location : Walney Offshore Windfarm – Irish Sea
Client : VSMC-DONG

Length (km): 40
Water depth (m) : 20
Vessel : DP vessel
Burial system : ROVJET605 (jetting)
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 19
Diameter : max 139 mm