Home » Projets » 2003 ILE D’YEU

2003 ILE D’YEU

Mainland to island / Shore ends / Laying and burial of 20 kV pc

Location : FRANCE – ILE D’YEU/SAINT JEAN DE MONTS
Client : NEXANS

Length (km): 18
Water depth (m) : 8
Vessel : Barge
Burial system : N.A.
Burial depth (m) : 1,8
Product : Power Cable
Weight (kg/m) : 28
Diameter : 111 mm

Other projects

  • 2014 SAFANIYA 2

    Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos