2005 PERENCO Gabon

The purpose of this operation was to surface lay 70 kM of power cable in Peranco Gabon Fields, in water depth less than 35m.

Location : GABON (South of PORT-GENTIL)
Client : PERENCO France

Longueur (km): 72
Water depth (m) : 30
Vessel : DP Vessel
Burial system : N.A.
Burial depth (m) : N.A.
Product : Power Cable
Weight (kg/m) : 19
Diameter : 112 / 108 / 96 mm

Other projects

  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :
    Plus d’infos
  • 2016 MARJAN GOSP

    Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos