The purpose of this operation was to surface lay 70 kM of power cable in Peranco Gabon Fields, in water depth less than 35m.

Location : GABON (South of PORT-GENTIL)
Client : PERENCO France

Longueur (km): 72
Water depth (m) : 30
Vessel : DP Vessel
Burial system : N.A.
Burial depth (m) : N.A.
Product : Power Cable
Weight (kg/m) : 19
Diameter : 112 / 108 / 96 mm