Home » Projets » 2005 FALCON

2005 FALCON

Separate shore ends / Laying and burial of FO cable

Location : Dubaï -Qatar – Barhain – Iran – Saudi – Yemen
Client : Alcatel Submarine Networks

Length (km): 228
Water depth (m) : 12
Vessel : Barge
Burial system : TJV05 – EBJ03 (Jetting)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 4
Diameter : 35,9 mm

Other projects

  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2022 2/AFRICA GENES

    2 x Direct landings in Genoa. Installation of shells and post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2001 I 2 I / Shore end MADRAS

    Cable lay and burial – 8 km CHENNAI shore end.
    Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
    Plus d’infos