Home » Projets » 1998-1999 VNF PARIS

1998-1999 VNF PARIS

Along river / Laying and burial of 3 multiple FO cables laid in one go.

Location : FRANCE / NEUILLY-CONFLANS – SEINE River
Client : MCI WORLDCOM, LD COM NETWORKS, VIATEL, TELIA

Length (km): 850
Water depth (m) : 15
Vessel : Spub Barge / River Barge
Burial system : ESV 07 / ESV11 (Plough)
BD (m) : 0,75
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos