Home » Projets » 2008 TAURT FIELD DEVELOPMENT

2008 TAURT FIELD DEVELOPMENT

Post trenching of subsea umbilical / PLIB

Location : Egypt
Client : Five Oceans Services – BP

Length (km): 64
Water depth (m) : 110
Vessel : DP Vessel
Burial system : ROVJET401 (Jetting)
Burial depth (m) : 1,5
Product : Umbilical
Weight (kg/m) : 5,9
Diameter : 104 mm

Other projects

  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos
  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)