Home » Projets » 2009 IMEWE/MENA/TEN/EIG

2009 IMEWE/MENA/TEN/EIG

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Alexandria & Suez (Egypt) – Tripoli
(Lebabon) – Marseilles (France) – Jeddah
(Saudi Arabia) – Monaco
Client : ASN

Length (km): 11,7
Water depth (m) : 20
Vessel : Barge
Burial system : TO Mobile
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 2003 AL KHAFJI

    Laying and burial of 40 km of power cable in Saudi Arabia.
    Burial system : TM02 (Trencher)
    Plus d’infos
  • 2001 CROSSING TAT 14

    PLIB works on telecom FO cable crossings with RTE / NGC power cables
    Burial system : MED1 (Dredge pump)
    Plus d’infos