Home » Projets » 2009 IMEWE/MENA/TEN/EIG

2009 IMEWE/MENA/TEN/EIG

FO cable shore ends, PLIB and installation of articulated pipes.

Location : Alexandria & Suez (Egypt) – Tripoli
(Lebabon) – Marseilles (France) – Jeddah
(Saudi Arabia) – Monaco
Client : ASN

Length (km): 11,7
Water depth (m) : 20
Vessel : Barge
Burial system : TO Mobile
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 3,9
Diameter : 38 mm

Other projects

  • 2023 GHANA 2

    Recovery and replacement of damaged Ace cable in Accra. Laying and post-wiring of 5 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos