Home » Projets » 2025 2 AFRICA PEARLS KUWAIT

2025 2 AFRICA PEARLS KUWAIT

1 x Direct landing in Kuwait City, shell installation, post-burial.

Location: Kuwait Salmiya Beach
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 960 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2023 CFXD

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos