Home » Projets » 2011 ORMONDE WINDFARM

2011 ORMONDE WINDFARM

Post Lay Inspection and Burial of 32 infield power cables.
Location : Ormonde Offshore Windfarm – Irish Sea
Client : VSMC-ORMONDE ENERGY
Length (km): 19.3
Water depth (m) : 21
Vessel : DP vessel
Burial system : ROVJET605 (jetting) 
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 25
Diameter : max 139 mm

Other projects

  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos