Home » Projets » 2011 ORMONDE WINDFARM

2011 ORMONDE WINDFARM

Post Lay Inspection and Burial of 32 infield power cables.
Location : Ormonde Offshore Windfarm – Irish Sea
Client : VSMC-ORMONDE ENERGY
Length (km): 19.3
Water depth (m) : 21
Vessel : DP vessel
Burial system : ROVJET605 (jetting) 
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 25
Diameter : max 139 mm

Other projects

  • 2014 SAFANIYA 2

    Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos
  • 2023 BLUE GENOA

    2 x Direct landings at Genoa in a directional borehole. Shell installation
    Burial system :