2015 AMRUMBANK

Provision of personnel and equipment to carry out the post burial of 86 infield power cables.

Location : AMRUMBANK Offshore Windfarm / German North Sea
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 75
Water depth (m) : up to 24 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.6
Weight (kg/m) : up to 36 kg/m
Diameter : up to 145 mm

Other projects

  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos
  • 2019 SVERDRUP

    Post lay burial of 199 km of sismic fibre optic cables in Johan Sverdrup field
    Burial system : ROVJET 1206 (jetting)
    Plus d’infos
  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos