Home » Projets » 2015 AMRUMBANK

2015 AMRUMBANK

Provision of personnel and equipment to carry out the post burial of 86 infield power cables.

Location : AMRUMBANK Offshore Windfarm / German North Sea
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 75
Water depth (m) : up to 24 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.6
Weight (kg/m) : up to 36 kg/m
Diameter : up to 145 mm

Other projects

  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos