Home » Projets » 2016 NORDSEE ONE

2016 NORDSEE ONE

Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.

Location : Nordsee One  Windfarm / North Sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 62
Water depth (m) : up to 29 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2005 FALCON

    Separate shore ends / Laying and burial of FO cable
    Burial system : TJV05 – EBJ03 (Jetting)
    Plus d’infos
  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos