Home » Projets » 2017 LTAII

2017 LTAII

Provision of personnel and equipment to carry out trenching services on four 115 kV submarine power cables on Berri field + one 115 kV and five 15 kV submarine power cables on Safaniya field.

Location : Berri and Safaniya fields – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 16 + 15 km
Water depth (m) : 0 to 6
Vessel : Barge
Burial system : TM03 + TM04 (trenchers)
Burial depth (m) : 1
Weight (kg/m) : up to 83
Diameter (mm) : up to 218

Other projects

  • 2018 TRIANEL BORKUM II OWF

    Provision of personnel and equipment to carry out the post lay burial of 18 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos