Home » Projets » 2017 LTAII

2017 LTAII

Provision of personnel and equipment to carry out trenching services on four 115 kV submarine power cables on Berri field + one 115 kV and five 15 kV submarine power cables on Safaniya field.

Location : Berri and Safaniya fields – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 16 + 15 km
Water depth (m) : 0 to 6
Vessel : Barge
Burial system : TM03 + TM04 (trenchers)
Burial depth (m) : 1
Weight (kg/m) : up to 83
Diameter (mm) : up to 218

Other projects

  • 2020 HAVHINGSTEN System

    Laying and burial of 1 fiber optic cable in Blackpool (UK) and 2 fiber optic cables in Houstrup (Denmark).
    Burial system : TO Mobile NV
    Plus d’infos
  • 2026 CSN-1 (Ecuador)

    Direct shore landing at Anconcito (Ecuador), shell laying and post-lay burial of 2.7 km of fiber optic cable.
    Burial system :
    Plus d’infos
  • 2008 TAURT FIELD DEVELOPMENT

    Post trenching of subsea umbilical / PLIB
    Burial system : ROVJET401 (Jetting)
    Plus d’infos