Home » Projets » 2026 CSN-1 (Ecuador)

2026 CSN-1 (Ecuador)

Direct shore landing at Anconcito (Ecuador), shell laying and post-lay burial of 2.7 km of fiber optic cable.

Location: Anconcito – Ecuador
Client: ASN
Year: January 2026

Length (km): 2.7 km
Burial system: EBJ
Product: Fiber optic cable

Other projects

  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 1999 CIRCE

    Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
    Burial system : MED1 (Dredge pump) – CASTOR (Trencher)
    Plus d’infos
  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos