Home » Projets » 2018 MERKUR OWF

2018 MERKUR OWF

Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.

Location : Merkur Offshore Windfarm / Germany 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5

Other projects

  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos
  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos