Home » Projets » 2018 MERKUR OWF

2018 MERKUR OWF

Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.

Location : Merkur Offshore Windfarm / Germany 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2026 SMW-6

    Direct landing in Yanbu (Saudi Arabia) and installation of articulated pipes on 0.7 km of fiber optic cable.
    Burial system :
    Plus d’infos
  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)