Pre Lay Grapnel Run and Route Clearance to a depth of 1,500 m in May.

Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina).

Installation of shells.

Location: Las Toninas (Argentina)

Client: Alcatel Submarine Networks (ASN)

Product: Optical fiber

Length: 2 x 7 km

Depth: 15 m

Ship: DP

Burial system: ROVJET 404

Burial depth: 1.5 m

Period: November

Other projects

  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2014 BUTENDIEK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2023 2 AFRICA SOUTH AFRICA

    1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
    Burial system :