Home » Projets » 2020 TANNAT and MALBEC Systems

2020 TANNAT and MALBEC Systems

Pre Lay Grapnel Run and Route Clearance to a depth of 1,500 m in May.

Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina).

Installation of shells.

Location: Las Toninas (Argentina)

Client: Alcatel Submarine Networks (ASN)

Product: Optical fiber

Length: 2 x 7 km

Depth: 15 m

Ship: DP

Burial system: ROVJET 404

Burial depth: 1.5 m

Period: November

Other projects

  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos
  • 2023 CFXD

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos