Home » Projets » 2021 AMITIE

2021 AMITIE

Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.

Place: La Grigne (France)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length:2.3 km
Depth: Up to 15 m
Ship: Barge
Burial system: Mass Flow Excavation
Burial depth: 1 m

Period: Sept 2021

Other projects

  • 2011 KASHAGAN

    Provison of burial services for 4 power and FO cables and 6 umbilicals.
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 2006 THAILAND KHO SAMUI

    Shore ends/Mainland to island/Laying and burial of 115 kV power cable
    Burial system : TJV05 – TJV08 (Jetting)
    Plus d’infos
  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos