2022 GRACE HOPPER

Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher

Location: New York USA, Smith Point
Customer: SUBCOM

Length (km): 8.5 km
Water depth (m) :
Vessel: VOS STAR
Beaching system: TMO 4
Beaching depth (m): 1.35 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos
  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos