Home » Projets » 2022 GRACE HOPPER

2022 GRACE HOPPER

Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher

Location: New York USA, Smith Point
Customer: SUBCOM

Length (km): 8.5 km
Water depth (m) :
Vessel: VOS STAR
Beaching system: TMO 4
Beaching depth (m): 1.35 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos