Home » Projets » 2024 NIGERIA 2

2024 NIGERIA 2

Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22.4 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 2011 DELMA REPAIR

    Provision of submarine power cable repair assistance.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos