Home » Projets » 2024 NIGERIA

2024 NIGERIA

Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos
  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos