Home » Projets » 2024 NIGERIA

2024 NIGERIA

Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2023 BLUE BASTIA

    1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies
    Burial system :
    Plus d’infos
  • 2022 EQUIANO

    1 x Direct landing at Sesimbra, shell installation and post-burial.
    Burial system :
    Plus d’infos
  • 2022 MAPUTO

    Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
    Burial system :
    Plus d’infos