Home » Projets » 2024 DOGGER BANK B

2024 DOGGER BANK B

Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.

Location: Dogger Bank B offshore Windfarm – United KingDom
Customer: DEME

Length (km): 182.175 km
Water depth (m): from 19.1 to 37.3 m
Vessel: DP vessel
Beaming system: ROVJET 1612(jetting)
Beaming depth (m): 1
Product : Power cable
cable type: 66kV AL 3Cx300mm² OD 144mm
66kV AL 3Cx500mm² OD 154.1mm
66kV AL 3Cx800mm² OD 169.1mm

Other projects

  • 2023 BLUE PALERMO

    1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system
    Burial system :
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos