2024 DOGGER BANK B

Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.

Location: Dogger Bank B offshore Windfarm – United KingDom
Customer: DEME

Length (km): 182.175 km
Water depth (m): from 19.1 to 37.3 m
Vessel: DP vessel
Beaming system: ROVJET 1612(jetting)
Beaming depth (m): 1
Product : Power cable
cable type: 66kV AL 3Cx300mm² OD 144mm
66kV AL 3Cx500mm² OD 154.1mm
66kV AL 3Cx800mm² OD 169.1mm

Other projects

  • 2016 MARJAN GOSP

    Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos