2025 CSN-1 PANAMA

Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber-optic cable

Location: Costa del Este, Panama
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 11.8 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2017 LTAII

    Provision of personnel and equipment to carry out trebsching services on a total of 10 submarine power cables.
    Burial system : TM03 + TM04 (trenchers)
    Plus d’infos
  • 2003 IFA 2000 – CABLE 11 REPAIR

    500 MW HVDC Power cable repair.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos