Home » Projets » 2023 MARTINIQUE

2023 MARTINIQUE

Installation of 2 new electrical links in the bay of Fort de France

Location: France mARTINIQUE / Fort de France
Customer: EDF

Length (km): 2 x 6 km
Water depth (m) :
Vessel: BARGE DP
Beaching system: TO MOBILE / NV
Beaching depth (m): N/A
Product : Power Cable
cable type: ø108mm

Other projects

  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos