2025 NOY YEU NOIRMOUTIER WINDFARM

EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.

Location: France
Customer: Eoliennes en mer Services

Length (km): 35 km
Water depth (m): 17 m
Vessel: GEOQUIP ELENA
Trenching system: Cable laying with shells
Trenching depth (m): N/A
Product : Power cable
cable type: