Home » Projets » 2025 NOY YEU NOIRMOUTIER WINDFARM

2025 NOY YEU NOIRMOUTIER WINDFARM

EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.

Location: France
Customer: Eoliennes en mer Services

Length (km): 35 km
Water depth (m): 17 m
Vessel: GEOQUIP ELENA
Trenching system: Cable laying with shells
Trenching depth (m): N/A
Product : Power cable
cable type:

Other projects

  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos
  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos