Home » Projets » 2023 GHANA

2023 GHANA

Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable

Location: Accra Ghana
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 4.9 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 1996 THAILANDE

    KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos