Home » Projets » 2023 MUANDA

2023 MUANDA

Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable

Location: Muanda – DRC
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2019 SVERDRUP

    Post lay burial of 199 km of sismic fibre optic cables in Johan Sverdrup field
    Burial system : ROVJET 1206 (jetting)
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos