2023 MUANDA

Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable

Location: Muanda – DRC
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2003 ILE D’YEU

    Mainland to island / Shore ends / Laying and burial of 20 kV pc
    Burial system : N.A.
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos